Overpass over the railway tracks. May - November 2021
$
$
Works: Overhaul of the overpass using carbon composite materials, as well as: injection, reconstruction of paving slabs, arrangement of staircases, arrangement of water drains, arrangement of expansion joints, installation of barrier fencing, asphalting and landscaping Construction: Beam/Crossbar Building type: Bridge