Railway bridge in Solikamsk

Defects: the disintegration of concrete beams; rebar corrosion; insufficient bearing capacity.
Results: Prevention the bridge destruction; load-bearing capacity restored; increased service life.

City: Solikamsk

Structure: Beam / girder

Building Type: Infrastructure